Design & maintain course materials including student & instructor
guides, practical exercises and instructor-led videos
Design, document & deploy RESTful API using OpenAPI 3.0, Flask,
SQLAlchemy & Google Cloud SQL to Google Cloud Run
Develop & deploy a learning management system using Flask &
Bootstrap to Google App Engine to ease curriculum delivery
Develop & deploy Python Discord bot to Google Compute Engine to
eliminate toil
Facilitate bootcamps and evaluate students' progress to ensure
productive learning environment
Shift Engineer
Jul 2018 - Dec 2020
MMC Gamuda KVMRT(T)
Studied and conducted various ground treatment methods to reduce
groundwater pressure and consolidate fractured rock formations at
planned cutterhead intervention locations
Coordinated heavy haulage, assembly & retrieval of tunnel boring
machine (TBM) components at pre-tunnelling & post-tunnelling stages
Ensured tunnel excavation works are carried out in accordance with
Tunnel Advance Plan with minimal volume loss
Scheduled tunnel work programmes and recorded critical path
activities during work shifts
Appointed as Temporary Works Coordinator (TWC) and ensured that a
suitable temporary works design is prepared, reviewed and
implemented on site in accordance with relevant drawings and
specifications
Planned and oversaw all heavy-lifting activities for safe and
efficient operations of lifting equipment
Established safety, health & environmental (SHE) compliance and
promoted safe conduct of work through daily surveillances
Succeeded in ensuring that all site interface issues between
contractors are registered, resolved and closed
Trainee Engineer (Internship)
Jan 2017 - Aug 2017
MMC Gamuda KVMRT(T)
Interpreted soil investigation bore logs to develop a detailed
profile of subsurface conditions along tunnel horizon
Evaluated subsurface conditions and surface structures to
determine suitable locations for planned cutterhead interventions